In the years 2006 - 2008 I worked as
a foreman and head foreman during construction of a bottom outlet, valve,
reservoir, spillways and intake structures at Upsa and Hraunaveita area
a part of the Karahnjukar project about 600 m over sea level.
And during this period the building work was in several areas and different
types of structures for example bottom outlet, dams, spillway, tunnels
and considerable work another job in this area.
A big part of the project was done at winter time in a very difficult
situations.
At this time, I usually always have my camera not only to take pictures
for myself, but often had to take photos for the project.
Workspace was pretty big so after working in this area for almost two
years and have to be all around the area at that time I had a lot of
photos to share and have put some of them here so people will be able
to see more them.
I have to apologize because I haven't finished to put an English text
with the images, but I will do it soon.
Click here or on the images below to take look at the pictures and
get some info with them.